CHS, South Sioux City, NE

Client had a brine maker, which needed to be connected with another tank in their system

  • Reached out and consulted with the original tank manufacturer’s engineering staff
  • Developed recommendation on how to properly modify this particular tank
  • Installed the recommended nozzle

Brine maker is now connected within the clients system with a downtime of only 24 hours